Engineering plan from a design doc
An approved design doc turned into workstreams and tickets with owners, due dates and dependencies.
- Time: 10 min
- Role: Engineering lead
- Product: Plan
Example output
The plan Sands writes from the design doc: the outcome, the work as tickets with owners, due dates and what each one waits on, and the decisions the doc left open.
Before you start
Sands drafts the plan without a connection. Connect the tracker the team works in.
Pick one tracker
The prompt
Copy this into Sands
Write a project plan for the search service migration in the attached design doc, Dec 7-18 2026. Team: Ana (senior engineer), Ben (engineer) and Jo (QA). Keep the decisions the doc leaves open as questions.
Why this works
- Prompt
Ask for the plan by name. Naming a plan as the thing you want builds it now, from the doc you attach.
- Source
Attach the doc as a file. A PDF, Word, text or Markdown file up to 4 MB, from the + menu in the composer.
- Practice
Research prior art first, in its own message. Sands does not search the web while it builds a plan. Ask it to look up how others solved the problem first, with sources cited, then ask for the plan in the same chat.
Get a better draft
The plan follows the design doc. The doc itself, real dates and the people who will do the work do more than rewording the prompt.
Keep the decisions open. What the doc does not settle stays in the plan as a question, not decided for you. Answer it in the chat when the team agrees.
- Practice
Check what each ticket waits on. Each ticket names what it waits on, and its due date comes after that work. Ask in the chat to change an order the doc had differently.
- Practice
Write the RFC yourself. Sands turns the design into work. The design doc itself, with its trade-offs, stays with you.
- Practice
Expect tickets, not code. Sands works in your tracker and in Slack. It does not read or change your code.
- Practice
Send it to Linear when it is ready. Send it from Send to in the plan drawer. In Linear it becomes a new project with a milestone for each workstream, issues and sub-issues.